LATEST NEWS

DataBank and Goodman Group Partner to Open Los Angeles Data Center. Read the press release.

Red Oak Data Center

Red Oak Data Center


(DFW9) 3080 Batchler Rd. - Red Oak, TX 75154

DataBank’s DFW9 will be the first of eight, 2-story data centers with 200,000 Sq. Ft. of data center space. The Phase 1 design of the site will feature 4 buildings and a 400MW sub-station that can deliver up to 240MW of critical IT power with ability to increase this in Phase 2 for a total of 480MW across all 8 buildings. This site will feature DataBank’s Universal Data Hall Design and be HPC-ready with the ability to support rear door heat exchangers and servers supporting water-to-chip cooling.

  • 200,000 IT Square Feet
  • 60MW Critical IT Load
  • 1 Onsite Carriers
Power
  • N+1 Power Design
  • 60MW Critical IT Load
  • 120/208V, 240/415V AC Power
  • 100% Renewable Energy Source
Cooling
  • N+1 Cooling Design
  • 45kW+ Cab Density Air
  • 100kW+ Cab Density Liquid
Interconnection
  • 1 Onsite Carriers
Platforms
  • Cabinets & Cages Colocation
  • HPC Capable HPC Compatibility
  • In-Metro DataBank Cloud
  • In-Metro DataBank Metal
  • In-Metro FedRAMP Cloud

Support

100%

Up Time SLA

7x24x365

Hours of Operation

7x24x365

Remote Hands

Special Request

Smart Hands

Data Center Datasheet Thumbnail

Data Center Specifications and Features

Download the data sheet for this edge data center to see which of its features will help you build the most agile hybrid infrastructure imaginable.
Download Now

Get Started

Discover the DataBank Difference today:
Hybrid infrastructure solutions with boundless edge reach and a human touch.