LATEST NEWS

DataBank Establishes $725M Financing Facility to Support Growth. Read the press release.

San Diego World Trade Data Center

San Diego World Trade Data Center


(SAN1) 12270 World Trade Drive Suite #100 - San Diego, CA 92128

DataBank’s premier SAN1 World Trade data center is the largest colocation facility in San Diego and provides significant scalability and capacity for this fast growing market. Multiple carrier meet-me rooms and multiple fiber entrances into the facility, as well as a blend of IP access provide extremely reliable connectivity and interconnection options.

  • 55,140 Raised Square Feet
  • 3.2MW Critical IT Load
  • 10 Onsite Carriers
Power
  • 2N Power Design
  • 3.2MW Critical IT Load
Cooling
  • N+1 Cooling Design
  • 10kW+ Cab Density Air
Interconnection
  • 10 Onsite Carriers
  • Managed Internet Connectivity
Platforms
  • Cabinets & Cages Colocation
  • In-Region DataBank Cloud

Data Center Compliance


Support

100%

Up Time SLA

7x24x365

Hours of Operation

7x24x365

Remote Hands

Special Request

Smart Hands

Data Center Specifications and Features

Data Center Specifications and Features

Download the data sheet for this edge data center to see which of its features will help you build the most agile hybrid infrastructure imaginable.
Download Now
San Diego Data Center Virtual Tour of DataBank SAN1

San Diego Data Center Virtual Tour of DataBank SAN1

Take a virtual tour of San Diego’s premiere data center facility. This colocation facility provides a 2N power design for the ultimate uptime assurance and 3.2 Megawatts of critical IT power for power-hungry workloads. This site offers over 55,000 square feet of data center space. Reserve your space now.


Watch the video of our SAN1 data center expansion in San Diego, California

Watch the video of our SAN1 data center expansion in San Diego, California

Our expansion of the SAN1 data center in San Diego, CA will offer an additional 40,000 square feet of raised flooring and 2 megawatts of critical IT power. The total build-out will be 55,000 sq. ft. and 3.2 megawatts of critical IT power when completed in Q2 of 2023.

Get Started

Get Started

Discover the DataBank Difference today:
Hybrid infrastructure solutions with boundless edge reach and a human touch.

Get A Quote

Request a Quote

Tell us about your infrastructure requirements and how to reach you, and one of the team members will be in touch.

Schedule a Tour

Tour Our Facilities

Let us know which data center you’d like to visit and how to reach you, and one of the team members will be in touch shortly.