DataBank’s new Red Oak Campus is a 292-acre, AI-ready data center development near Dallas featuring 1.6M sq ft and 480MW of critical IT power. Watch the rendering animation and reserve your space today.
Discover the future of AI-ready infrastructure at DataBank’s new Red Oak Campus—just 20 minutes from downtown Dallas. This 292-acre campus is engineered for scale, speed, and innovation. Phase 1 includes four state-of-the-art, HPC-ready data centers—DFW9, DFW10, DFW11, and DFW12—each delivering 60MW of critical IT power and 200,000 sq ft of data center space. Backed by a 400MW on-site power substation (expandable to 800MW), Red Oak sets the standard for enterprise and hyperscale workloads.
Red Oak Campus Highlights: 292 Acres, Strategically Located Near Dallas 4 Data Centers in Phase 1 (800,000 sq ft, 240MW Total) 8 Data Centers Upon Completion (1.6M sq ft, 480MW Total) 400MW On-Site Substation (Expandable to 800MW) Universal Data Hall Design (UDHD) for Air + Liquid Cooling Supports 45kW+ Air Cooling and 130kW+ Liquid Cooling AI-Optimized Power & Cooling Infrastructure Amenities: Offices, Conference Rooms, Wi-Fi, Kitchen, Refreshments Tiered Physical Security + Modern Workspace Design Whether deploying traditional enterprise IT or cutting-edge AI workloads, Red Oak delivers the flexibility, scale, and reliability your business needs.
Discover the DataBank Difference today:
Hybrid infrastructure solutions with boundless edge reach and a human touch.
Tell us about your infrastructure requirements and how to reach you, and one of team members will be in touch shortly.
Let us know which data center you'd like to visit and how to reach you, and one of team members will be in touch shortly.
Enjoying our resource? Get the latest news and articles delivered straight to your inbox.