DataBank’s new Red Oak Campus is a 292-acre, AI-ready data center development near Dallas featuring 1.6M sq ft and 480MW of critical IT power. Watch the rendering animation and reserve your space today.
Discover the future of AI-ready infrastructure at DataBank’s new Red Oak Campus—just 20 minutes from downtown Dallas. This 292-acre campus is engineered for scale, speed, and innovation. Phase 1 includes four state-of-the-art, HPC-ready data centers—DFW9, DFW10, DFW11, and DFW12—each delivering 60MW of critical IT power and 200,000 sq ft of data center space. Backed by a 400MW on-site power substation (expandable to 800MW), Red Oak sets the standard for enterprise and hyperscale workloads.
Red Oak Campus Highlights: 292 Acres, Strategically Located Near Dallas 4 Data Centers in Phase 1 (800,000 sq ft, 240MW Total) 8 Data Centers Upon Completion (1.6M sq ft, 480MW Total) 400MW On-Site Substation (Expandable to 800MW) Universal Data Hall Design (UDHD) for Air + Liquid Cooling Supports 45kW+ Air Cooling and 130kW+ Liquid Cooling AI-Optimized Power & Cooling Infrastructure Amenities: Offices, Conference Rooms, Wi-Fi, Kitchen, Refreshments Tiered Physical Security + Modern Workspace Design Whether deploying traditional enterprise IT or cutting-edge AI workloads, Red Oak delivers the flexibility, scale, and reliability your business needs.
Discover the DataBank Difference today:
Hybrid infrastructure solutions with boundless edge reach and a human touch.
Tell us about your infrastructure requirements and how to reach you, and one of team members will be in touch shortly.
"*" indicates required fields
Let us know which data center you'd like to visit and how to reach you, and one of team members will be in touch shortly.
"*" indicates required fields