Start with a clear inventory of what needs to connect to what, design for diversity at every layer, document everything as you build, test failover before you need it, and review the design at least annually. These five practices catch the majority of issues that cause interconnection projects to underdeliver. Skipping any of them usually shows up as either unplanned costs or unplanned outages within the first 18 months.